Salto de Touro, A Coruña, Spain

Customer: Patrimonio Hidroeléctico de Galicia S.l.

Location: River Ulla (Touro–Vila de Cruces). A Coruña, Spain

Main technical data:

  • 60 m 3 that can boost the Salto de Touro throughout a day.
  • Capture with dam: 165 m crown length.
  • Taking and maintaining ecological flow.
  • The evacuation to the electricity grid will be carried out by means of a line dedicated to 66 kV to the Portodemouros substation.