Cernadilla High Speed line in Zamora, Spain
Customer: Ministerio de Fomento. ADIF
Location: Zamora, Spain
Main technical data:
- 19 km of platform.
- Five viaducts (two large).
- Nine sections, 419 m long.
- 16 spans, 756 m long.
- Two tunnels, 1,045 m and 1,270 m long.
- Overpass 10.
- Underpass 5.