• Maintenance Mos Folgoso, Spain

Maintenance Mos Folgoso, Spain

Customer: Ministerio de Fomento. Gobierno de España

Location: Zona Sur de la Provincia de Pontevedra, Spain

Main Technical Data:

  • 230 km of road to be conserved.
  • Freeway and conventional road sections.
  • High traffic intensity (more than 50,000 vehicles per day in some sections).
  • Management, conservation and exploitation of urban tunnels in the surroundings of Vigo (Bouzas, Isaac Peral).
  • Management, conservation and operation of inter-urban tunnels (Folgoso, on the A-52, 2,550 m).
  • Management, conservation and operation of important structures: International Bridge of Tui, Viaducts of Oulo, Deva, Vilariño ...
Main associated facilities:
  • 2 Flux storage silos.
  • 1 Flux storage vessel with crane bridge.
  • COEX and Mos Tunnel Management Center.
  • Folgoso tunnel control center.